A lien waiver is a receipt for payment on a construction project: in exchange for money, you give up lien rights on the amount or project it covers. There are exactly four standard types, and signing the wrong one — or signing the right one at the wrong time — can waive rights to money you haven't actually received. This page gives you all four as fillable PDF templates, free — just tell us where to send them — plus plain-English rules for when each one is safe to sign.

⚠️ Before you use any template: some states require lien waivers to follow exact statutory wording, and a non-conforming form can be invalid — or, worse, enforceable in ways you didn't intend. Check the rules for your project's state first with our free 50-state lookup, and have an attorney review anything unusual. These are general-purpose templates, not legal advice.

The four types — and when each is safe to sign

1. Conditional Waiver — Progress Payment

Waives rights through a stated date, but only once the payment actually clears. If the check bounces, you've waived nothing.

Safe to sign: when you're handing over the waiver at the same time as receiving a progress check.

⬇ Download (PDF)

2. Unconditional Waiver — Progress Payment

Waives rights through a stated date the moment you sign — even if the payment later bounces.

Safe to sign: only after the money is actually in your account and cleared. Never sign in exchange for a promise.

⬇ Download (PDF)

3. Conditional Waiver — Final Payment

Waives all remaining rights on the project, effective only when the final payment clears.

Safe to sign: at closeout, when the final check is being exchanged.

⬇ Download (PDF)

4. Unconditional Waiver — Final Payment

The most powerful waiver: everything, immediately, on signature. This is the one that ends disputes before they start — in the payer's favor.

Safe to sign: only after the final payment has fully cleared, and only once the exceptions (retention, disputed claims, unbilled changes) are written in.

⬇ Download (PDF)

Three rules that prevent most waiver disasters

Free: LienWarden computes every notice and lien deadline for your project in all 50 states and drafts the documents when they're due (exact dates and full documents on paid plans). Your first project is free →

Waivers are the easy part — deadlines are the trap

Most contractors don't lose lien rights by signing a bad waiver. They lose them by missing a preliminary-notice or filing deadline they never knew was running. That's the part LienWarden automates: enter your project dates, and it computes every deadline in your state, alerts you at 60/30/7 days, and prepares the documents — preliminary notices, notices of intent, demand letters — when they're needed.

Never lose lien rights to a missed deadline

Deadline autopilot for everyone who holds lien rights — contractors, subs, suppliers, rental yards, design professionals. Your first project is free.

Start free — no card required
These templates are general-purpose forms for informational use, not legal advice, and LienWarden is not a law firm. Lien waiver requirements vary by state and by project type; verify your state's rules (free lookup) and consult an attorney for advice on your situation.